IBM 000-085 Test information:
Number of questions: 45-54
Time allowed in minutes: 75
Required passing score: 61-68%
Test languages: English
12 months of experience with IBM BladeCenter configuration and implementation
Operating System Knowledge (Microsoft Windows, Linux, and VMware)
Knowledge of Operating System deployment strategies
Knowledge of Networking/SAN connectivity
Knowledge of IBM BladeCenter Module Options
Experience with IBM Systems Director
Experience with Datacenter design and capacity planning
Evaluate and Establish Customer Environment and Plans
Apply Information / Installation Planning / Migration Considerations
Installation and Post Install Support
l Network and storage switch configuration
l Consider tuning options for best performance
l Review and establish customer support plan
More details about IBM 000-085 Exam can be found here.
For example:
A customer has an HS21 blade with no local disk. They are attempting to set up boot from SAN using a Windows 2003 CD. Which sequence is correct for this procedure?
A.Install Windows from the CD using the QLogic driver provided on the CD, configure the LUN and zone for the target server, and then configure the blade BIOS to boot from SAN.
B.Configure the LUN and zone for the target server, install Windows from the CD and press F6 when prompted to supply the driver, and then configure the QLogic adapter BIOS to boot from SAN.
C.Configure the LUN and zone for the target server, configure the QLogic adapter BIOS to boot from SAN, install Windows from the CD, and then press F6 when prompted to supply the driver.
D.Configure the blade BIOS to boot from SAN, configure the LUN and zone for the target server, and then install Windows from the CD using the QLogic driver provided on the CD.
Answer:C